1. Check complete components numbers.
2. Only make orders to suppliers within the "list of qualified suppliers".
*Note:
Any qualified supplier must:
① Supplier Risk Rating (size, location, orders capacity).
② Suppliers cooperation historical rating (historical delivery performance).
1. Packaging inspection (box labels, product labels, date code, quantity).
2. Visual inspection (appearance integrity, degree of oxidation, with or without foot off or re-treatment).
3. Supplier shipping document series (COC, inspection reports, lead unleaded specification).
4. Ensure the factory original ones.
• Output Level Test • Comprehensive Function Test • Analog Parameter Test
2. If the room temperature test is passed, the high / low temperature test can be performed as required.
3. Set aside a certain number of samples for further electrical characteristics analysis.
1. Vacuum Packaging.
2."Electrostatic discharge" protection, anti-high temperature and anti-high humidity.
1. Designated long-term cooperation partners.
2. Traceability during transport.
1. Confirm "customer has the receipt".
2. Confirm "pass the customers quality test".
3. "Return customers" after using.
4. Promise "30 days of quality problems return".
5. In joint with third-party electronic component testing center to provide Technical Support.
Copyright 2015 Pinso Technology (HK) Co.,Limited. All rights reserved.